Be Charge Stadiocharging location

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 2
Usage: Public
Operational Status: Operational
Latitude: 44.993034
Longitude: 10.869777
OCM Ref: OCM-194206
Network/Operator

Be Charge (Italy) https://www.bec.energy/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

Type 2 (Socket Only)

Status Unknown
4 Present
OCM-CN-316352
22 kW

Add your own comment/check-in for this location:

Sign In
[ General Comment , Charged Successfully ]

Accanto abbiamo anche la piscina mentre i bar e ristoranti più vicini si trovano ad almeno 15 minuti a piedi, come anche il centro storico. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-stadio-di-pegognaga-mn-via-piero-gobetti-20-t26276.html

https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-stadio-di-pegognaga-mn-via-piero-gobetti-20-t26276.html Comment by ForumElettrico.it 07/19/2022 09:00:39

Other Charging Locations

There are 9 matching results

Ewiva Coop Pegognaga
1   5

Via Enrico Berlinguer 80
Pegognaga
MN
Italy
View
0.41 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Be Charge
1   5

SP 52 23/A
Pegognaga
MN
Italy
View
0.65 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Ewiva Conad Gonzaga
3   7

Via Madre Teresa di Calcutta 2/A
Gonzaga
Lombardy
Italy
View
3.28 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

GasGas Municipio
1   5

Piazza Guglielmo Marconi 7
San Benedetto Po
MN
Italy
View
4.41 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

BeaglePlug Stadio
1   5

Via Tazio Nuvolari 5
Moglia
MN
Italy
View
4.46 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

GasGas D'Annunzio
1   5

Via D'Annunzio 3/E
San Benedetto Po
MN
Italy
View
4.6 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

GasGas Coop
1   5

Via Agostino Zavattini 1
San Benedetto Po
MN
Italy
View
4.73 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

ADS Sarni Po Ovest A22
5   16

A22 Autostrada del Brennero km. 267,5 direzione sud
Bagnolo San Vito
MN
46031
Italy
View
4.83 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO

Ristorante le Franchine
 

Via Moglia, 37
Villanova
Reggiolo
RE
42046
Italy
View
5.47 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)

Upload your own photos for this location: Sign In

Uploaded by ForumElettrico.it on 2022-07-19

Uploaded by ForumElettrico.it on 2022-07-19

Uploaded by ForumElettrico.it on 2022-07-19

Uploaded by ForumElettrico.it on 2022-07-19

Uploaded by ForumElettrico.it on 2022-07-19