Be Charge Stadiocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Accanto abbiamo anche la piscina mentre i bar e ristoranti più vicini si trovano ad almeno 15 minuti a piedi, come anche il centro storico. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-stadio-di-pegognaga-mn-via-piero-gobetti-20-t26276.html
https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-stadio-di-pegognaga-mn-via-piero-gobetti-20-t26276.html Comment by ForumElettrico.it 07/19/2022 09:00:39
Other Charging Locations
There are 9 matching results
Ewiva Coop Pegognaga
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Conad Gonzaga
3
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
GasGas Municipio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeaglePlug Stadio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
GasGas D'Annunzio
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
GasGas Coop
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ADS Sarni Po Ovest A22
5
16
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Ristorante le Franchine
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-07-19
Uploaded by ForumElettrico.it on 2022-07-19
Uploaded by ForumElettrico.it on 2022-07-19
Uploaded by ForumElettrico.it on 2022-07-19
Uploaded by ForumElettrico.it on 2022-07-19