BeaglePlug Stadiocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Il centro città dista solo 10 minuti a pedi ed essendo questa al momento l'unica colonnina presente in città è anche strategica per visitarla. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-beagleplug-22-kw-stadio-di-moglia-mn-via-tazio-nuvolari-5-t31574.html
https://www.forumelettrico.it/forum/colonnina-beagleplug-22-kw-stadio-di-moglia-mn-via-tazio-nuvolari-5-t31574.html Comment by ForumElettrico.it 05/12/2023 11:13:05
Other Charging Locations
There are 9 matching results
Enel X
2
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Coop
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Trattoria Pizzeria Piccolo Borgo
2
3
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ristorante le Franchine
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Ristorante Prima o Poi
1
(Unknown)
Operational
Be Charge Stadio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Conad Gonzaga
3
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Coop Pegognaga
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Sinergas Impianti Municipio
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-05-12
Uploaded by ForumElettrico.it on 2023-05-12
Uploaded by ForumElettrico.it on 2023-05-12
Uploaded by ForumElettrico.it on 2023-05-12
Uploaded by ForumElettrico.it on 2023-05-12