EnerMia RTA La Pinetacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]In pratica serve solo per ricaricare le auto degli ospiti della struttura. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enermia-22-kw-rta-la-pineta-santo-stefano-di-magra-sp-via-cisa-sud-472-t26369.html
https://www.forumelettrico.it/forum/colonnina-enermia-22-kw-rta-la-pineta-santo-stefano-di-magra-sp-via-cisa-sud-472-t26369.html Comment by ForumElettrico.it 07/24/2022 16:10:57
Other Charging Locations
There are 9 matching results
Spotlink AdS Magra Est
1
2
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
IPlanet AdS Magra Ovest
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger CentroLuna - aperto a veicoli non Tesla
1
2
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
COOP CC Centroluna by Duferco
5
16
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Arcola
2
9
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Via della Repubblica
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ricarica Multisala Moderno
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eni Albiano Magra
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X McDonald's
3
7
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-07-24
Uploaded by ForumElettrico.it on 2022-07-24
Uploaded by ForumElettrico.it on 2022-07-24