Spotlink AdS Magra Estcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
SpotLink – e.motion https://www.emotion-team.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Failed to Charge (Equipment Not Operational) ]Dotata di connettori CCS Combo 2 da 90 kW, una CHAdeMO da 90 kW, Tipo 2 da 22 kW e situata tra le uscite di Sarzana e La Spezia. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-fast-spotlink-autogrill-magra-est-sp-a12-km-96-5-dir-genova-t36375.html
https://www.forumelettrico.it/forum/colonnina-fast-spotlink-autogrill-magra-est-sp-a12-km-96-5-dir-genova-t36375.html Comment by ForumElettrico.it 10/16/2024 12:47:49
Other Charging Locations
There are 9 matching results
IPlanet AdS Magra Ovest
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnerMia RTA La Pineta
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via della Repubblica
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Arcola
2
9
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger CentroLuna - aperto a veicoli non Tesla
1
2
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
COOP CC Centroluna by Duferco
5
16
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eni Albiano Magra
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ricarica Multisala Moderno
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Atlante Ceparana
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-10-16
Uploaded by ForumElettrico.it on 2024-10-16