Be Charge Casinalbocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Intorno abbiamo bar, ristoranti e negozi di ogni tipo, compreso un'altra colonnina: di fatto ci sono più prese in questa frazione che in una città come Vicenza :lol: . Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-formigine-mo-via-don-giulio-maselli-4-casinalbo-t27899.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-formigine-mo-via-don-giulio-maselli-4-casinalbo-t27899.html Comment by ForumElettrico.it 10/17/2022 09:16:29
Other Charging Locations
There are 9 matching results
Enel X Way Casinalbo
2
7
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BEST WESTERN PLUS Hotel Modena Resort
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Be Charge McDonald's Casinalbo
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
CONAD Baggiovara | EnelX
1
5
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Ospedale di Baggiovara
2
8
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Formigine Trento Trieste | EnelX
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Castello
4
11
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Municipio
3
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Formigine Libertà | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-10-17
Uploaded by ForumElettrico.it on 2022-10-17
Uploaded by ForumElettrico.it on 2022-10-17
Uploaded by ForumElettrico.it on 2022-10-17
Uploaded by ForumElettrico.it on 2022-10-17