Enel X Way Castellocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Colonnina appena sostituita, e nessun problema con card Be Charge sulla presa di sinistra. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post383505.html#p383505
https://www.forumelettrico.it/forum/post383505.html#p383505 Comment by ForumElettrico.it 05/27/2023 15:20:03
[ General Comment , Charged Successfully ]Finalmente funzionante!!!
Comment by ForumElettrico.it 01/22/2019 08:59:59
[ General Comment , Did Not Visit Location ] https://www.forumelettrico.it/forum/colonnina-e-distribuzione-22kw-castello-di-formigine-mo-via-s-francesco-d-assisi-9-t2949.html Comment by ForumElettrico.it 06/08/2018 06:17:48
[ General Comment , Failed to Charge (Equipment Problem) ]https://www.forumelettrico.it/forum/colonnina-e-distribuzione-22kw-castello-di-formigine-mo-via-s-francesco-d-assisi-9-t2949.html
Comment by ForumElettrico.it 06/08/2018 06:17:30
Other Charging Locations
There are 9 matching results
Formigine Trento Trieste | EnelX
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Formigine Libertà | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Municipio
3
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Piscina
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Conad
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge AdS IP
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Formigine Chiesa di Corlo | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Casinalbo
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Casinalbo
2
7
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-05-27
Uploaded by ForumElettrico.it on 2023-05-27
Uploaded by ForumElettrico.it on 2023-05-27
Uploaded by ForumElettrico.it on 2023-05-27
Uploaded by ForumElettrico.it on 2023-05-27
Uploaded by ForumElettrico.it on 2019-01-22
Uploaded by ForumElettrico.it on 2019-01-22
Uploaded by ForumElettrico.it on 2018-06-08
Uploaded by ForumElettrico.it on 2018-06-08
Uploaded by ForumElettrico.it on 2018-06-08
Uploaded by ForumElettrico.it on 2018-06-08