To edit, add comments or upload photos: Sign In
Aibiquecharging location
Nearest Address:
Calle el Chamorro
El Pinar de El Hierro
Canary Islands
38914
Spain
General Information:
Gorona del Viento. Cabildo El Hierro
Number Of Stations/Bays:
2
Usage:
Public
Usage Cost:
Free
Operational Status:
Operational
Latitude:
27.70357119076978
Longitude:
-17.98107000928735
OCM Ref: OCM-208648
Network/Operator
eTecnic http://www.etecnic.es (+34) 977 276 952
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-347180
11 kW
AC (Three-Phase)
CEE 7/4 - Schuko - Type F
Operational
1 Present
OCM-CN-347181
2.3 kW
AC (Single-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Casa rural los Abuelos
0.19 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parador de El Hierro
1.65 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Frontera
1
3.87 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SuperDino Frontera
1
4.02 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Puerto de La Restinga
2
4.38 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cooperativa Campo de Frontera
1
5.22 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Gorona El Viento Central Eléctrica
1
6.69 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Puerto de La Estaca
7.49 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Valverde - Calle San Francisco
8.17 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)