To edit, add comments or upload photos: Sign In
SuperDino Fronteracharging location
Nearest Address:
C. el Lunchon, 35
Frontera
Spain
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
0,45€/kWh DC - 0,40€/kWh AC
Operational Status:
Operational
Latitude:
27.753362275733082
Longitude:
-18.015146654992805
OCM Ref: OCM-312325
Network/Operator
Endesa http://www.endesa.es/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-601788
60 kW
DC
900 V
150 A
XCharge Juicepump60 DC charger allows charging one vehicle at 60kW, or two simultaneous charges at 30kW.
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Frontera
1
0.18 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cooperativa Campo de Frontera
1
1.47 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aibique
1
4.02 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Casa rural los Abuelos
4.22 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parador de El Hierro
4.27 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Pozo de la Salud
1
5.47 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Gorona El Viento Central Eléctrica
1
6.7 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Valverde - Calle San Francisco
7.15 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Valverde - El Hierro
1
7.16 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)