Be Charge Impianti sportivicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Dietro la colonnina abbiamo due campi da calcio mentre di fronte un campo da tennis ed un parco con giochi per bambini. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-impianti-sportivi-sala-bolognese-bo-via-paolo-borsellino-1-t28176.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-impianti-sportivi-sala-bolognese-bo-via-paolo-borsellino-1-t28176.html Comment by ForumElettrico.it 10/29/2022 15:40:49
Other Charging Locations
There are 9 matching results
Be Charge Municipio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge San Giacomo del Martignone
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Osteria Nuova
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Calderara di Reno Bazzane | EnelX by Hera
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lampionet iN's Mercato
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Dico San Vitale Grande
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-10-29
Uploaded by ForumElettrico.it on 2022-10-29
Uploaded by ForumElettrico.it on 2022-10-29
Uploaded by ForumElettrico.it on 2022-10-29
Uploaded by ForumElettrico.it on 2022-10-29