Be Charge Municipiocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Appena passato il municipio e girando a sinistra troviamo subito un paio di bar: in paese si trovano anche due ristoranti ed una pizzeria. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-municipio-di-sala-bolognese-bo-piazza-guglielmo-marconi-7-c-padulle-t33241.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-municipio-di-sala-bolognese-bo-piazza-guglielmo-marconi-7-c-padulle-t33241.html Comment by ForumElettrico.it 08/29/2023 09:54:27
Other Charging Locations
There are 9 matching results
Be Charge Impianti sportivi
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Castello D'argile
1
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Municipio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge San Giacomo del Martignone
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Osteria Nuova
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lampionet iN's Mercato
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Calderara di Reno Bazzane | EnelX by Hera
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Stiatico Alessandrini | EnelX
2
5
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-08-29
Uploaded by ForumElettrico.it on 2023-08-29
Uploaded by ForumElettrico.it on 2023-08-29
Uploaded by ForumElettrico.it on 2023-08-29
Uploaded by ForumElettrico.it on 2023-08-29