Be Charge Ponti sul Minciocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Situata a pochi minuti a piedi dal Castello Scaligero. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-ponti-sul-mincio-mn-via-guglielmo-marconi-73-t34199.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-ponti-sul-mincio-mn-via-guglielmo-marconi-73-t34199.html Comment by ForumElettrico.it 10/23/2023 05:27:47
Other Charging Locations
There are 9 matching results
Tesla Castelnuovo del Garda
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ENEL X Tangenziale Peschiera Del Garda
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lidl Peschiera del Garda
3
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
IPlanet IP
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ionity Peschiera
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ADS IP Peschiera del Garda | ENELX E-VIA FLEX-E
5
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Via Venezia
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Eni
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-10-23
Uploaded by ForumElettrico.it on 2023-10-23
Uploaded by ForumElettrico.it on 2023-10-23
Uploaded by ForumElettrico.it on 2023-10-23
Uploaded by ForumElettrico.it on 2023-10-23