To edit, add comments or upload photos: Sign In
Tesla Castelnuovo del Garda charging location
Nearest Address:
Via Coppo
Castelnuovo del Garda
Verona
Italy
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
Operational Status:
Operational
Latitude:
45.42334423372262
Longitude:
10.710858806166243
OCM Ref: OCM-471167
Network/Operator
Tesla (including non-tesla) https://www.tesla.com/en_AU/support/non-tesla-supercharging
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
20 Present
OCM-CN-791361
250 kW
DC
V4
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
IPlanet IP
1
5
0.48 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra
1
5
0.75 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ADS IP Peschiera del Garda | ENELX E-VIA FLEX-E
5
7
0.86 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Via Venezia
1.09 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ionity Peschiera
1.11 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Eni
1
6
1.31 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Gardaland Hotel
1
2
1.51 Miles
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Be Charge Ponti sul Mincio
1
5
1.55 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ENEL X Tangenziale Peschiera Del Garda
1.59 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In