JoinOn Hotel Le Villecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Situata nel parcheggio dell'Hotel dove troviamo anche un ristorante, ma nessun bar per gli esterni. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-joinon-22-kw-hotel-le-ville-modena-mo-via-pietro-giardini-1270-t35177.html
https://www.forumelettrico.it/forum/colonnina-joinon-22-kw-hotel-le-ville-modena-mo-via-pietro-giardini-1270-t35177.html Comment by ForumElettrico.it 12/20/2023 08:46:57
Other Charging Locations
There are 9 matching results
Duferco Ospedale di Baggiovara
2
8
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
CONAD Baggiovara | EnelX
1
5
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge McDonald's Casinalbo
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BEST WESTERN PLUS Hotel Modena Resort
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Enel X Way Casinalbo
2
7
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Casinalbo
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Eni
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LIDL Modena
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-12-20
Uploaded by ForumElettrico.it on 2023-12-20
Uploaded by ForumElettrico.it on 2023-12-20
Uploaded by ForumElettrico.it on 2023-12-20
Uploaded by ForumElettrico.it on 2023-12-20