To edit, add comments or upload photos: Sign In
Rest Area KM 116 B Tol Bakauheni - Terbanggi Besarcharging location
Nearest Address:
Rest Area KM 116 B Tol Bakauheni - Terbanggi Besar
, Bumiraharjo, Bumi Ratu Nuban,
Central Lampung Regency,
Lampung
34161
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
Rp.2467/kWh
Operational Status:
Operational
Latitude:
-5.088972536686118
Longitude:
105.21275325112298
OCM Ref: OCM-298864
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-547744
50 kW
DC
ABB Terra 50
CHAdeMO
Operational
1 Present
OCM-CN-547745
50 kW
DC
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-547746
22 kW
AC (Three-Phase)
Delta AC Max
CCS (Type 2)
Operational
2 Present
OCM-CN-805604
180 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 7 matching results
Rest Area KM 116 A Tol Bakauheni–Terbanggi Besar
0.07 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Kota Metro
PLN ULP Kota Metro,
Jalan Ade Irma Suryani Nasution, Metro Pusat
Kab Metro
Lampung
34111
Indonesia
View
6.67 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Lacosta Cafe
6.99 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN UP3 Metro Lampung
7.07 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BBC Hotel
10.24 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Bandar Jaya
10.73 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Sukadana
10.76 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In