To edit, add comments or upload photos: Sign In
BBC Hotelcharging location
Nearest Address:
BBC Hotel,
Jl Proklamator
Terbanggi Besar
Lampung
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
-4.9408
Longitude:
105.2124
OCM Ref: OCM-480000
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-805854
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 7 matching results
PLN ULP Bandar Jaya
0.9 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Sukadana
8.01 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Rest Area KM 116 B Tol Bakauheni - Terbanggi Besar
Rest Area KM 116 B Tol Bakauheni - Terbanggi Besar
, Bumiraharjo, Bumi Ratu Nuban,
Central Lampung Regency,
Lampung
34161
Indonesia
View
10.24 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest Area KM 116 A Tol Bakauheni–Terbanggi Besar
10.26 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Kota Metro
PLN ULP Kota Metro,
Jalan Ade Irma Suryani Nasution, Metro Pusat
Kab Metro
Lampung
34111
Indonesia
View
13.65 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Lacosta Cafe
14.39 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN UP3 Metro Lampung
14.58 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In