To edit, add comments or upload photos: Sign In
Costco Zaragozacharging location
Nearest Address:
Autovía del Nordeste
Aragón
50197
Spain
Number Of Stations/Bays:
24
Usage:
Public - Pay At Location
Usage Cost:
0,33€/kWh DC - 0,25€/kWh AC
Operational Status:
Partly Operational (Mixed)
Latitude:
41.63515098004552
Longitude:
-0.981366123183534
OCM Ref: OCM-305645
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
22 Present
OCM-CN-578260
7.4 kW
AC (Single-Phase)
CCS (Type 2)
Operational
2 Present
OCM-CN-578261
180 kW
DC
920 V
300 A
Ingeteam RAPID180 Charger (375A peak). The DC charger allows charging one vehicle at 180kW, or two simultaneous charges at 90kW.
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Hotel Plaza Feria
2
0.48 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Repsol Diagonal Plaza
0.52 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Feria de muestras de Zaragoza
0.54 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
McDonald's Plaza
0.6 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ronda del Ferrocarril (Atlante)
0.68 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Diagonal Plaza
0.8 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Logistica Eroski Zaragoza
0.89 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Milence (Estacionamiento Camiones)
1.42 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger Zaragoza
2
1.59 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In