Magliano Sabina Superchargercharging location
http://www.lapergola.it/home
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Tesla (including non-tesla) https://www.tesla.com/en_AU/support/non-tesla-supercharging
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]8 supercharger v2 fino a 150 kW più 4 v3 attivati di recente, aperti anche ai veicoli non Tesla. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-tesla-supercharger-hotel-la-pergola-magliano-sabina-ri-strada-flaminia-km-63-9-frangellini-t27996.html
https://www.forumelettrico.it/forum/colonnine-tesla-supercharger-hotel-la-pergola-magliano-sabina-ri-strada-flaminia-km-63-9-frangellini-t27996.html Comment by ForumElettrico.it 11/11/2023 14:55:12
Other Charging Locations
There are 9 matching results
EnelX EVA+ Magliano Sabina
4
11
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eneldrive Crispi
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ostello Magliano Sabina
1
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
MAGLIANO SABINA Viale XIII Giugno | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Magliano Sabina Pineta comunale | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Magliano Sabina Cimitero | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Foglia Piazza Castello | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Free To X ADS Flaminia Ovest
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free to X AdS Flaminia Est
3
11
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-11-11
Uploaded by ForumElettrico.it on 2023-11-11
Uploaded by ForumElettrico.it on 2023-11-11
Uploaded by ForumElettrico.it on 2023-11-11