To edit, add comments or upload photos: Sign In
Besenzonecharging location
General Information:
Da 10 A a 25 A 400 V
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Private - Restricted Access
Usage Cost:
Free
Operational Status:
Operational
Latitude:
44.98548
Longitude:
9.96595
OCM Ref: OCM-66259
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 30 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - No Equipment Details
Equipment details are not known for this location. If you can provide more information please sign in and choose the Edit option.
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Besenzone Sant'Omobono | EnelX
0.65 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eni
1
5
1.83 Miles
Public
Operational
Level 3: High (Over 40kW)
Type 2 (Socket Only)
Public
Operational
Level 3: High (Over 40kW)
Type 2 (Socket Only)
Ewiva Cortemaggiore
3
7
1.96 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bersano SP26 | EnelX
1
4
2.38 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Castello di San Pietro
1
3
2.62 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Municipio
1
5
3.2 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Free To X AdS Arda Est
3
11
3.3 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free To X AdS Arda Ovest
2
10
3.41 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way
1
5
3.81 Miles
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)