Ewiva Cortemaggiorecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Ewiva (IT) https://ewiva.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema passando card A2A e poi infilando il CCS Combo 2 ed ho interrotto avvicinandomi all'auto e premendo il pulsante sulla presa auto. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post405728.html#p405728
https://www.forumelettrico.it/forum/post405728.html#p405728 Comment by ForumElettrico.it 10/07/2023 15:49:09
Rating: 5 out of 5 [ General Comment , Charged Successfully ]working ok
Comment by Roberto 11/15/2022 16:14:17
[ General Comment , Charged Successfully ]2 connettori CCS Combo 2 da 150 kW nella postazione di sinistra e 2 connettori CCS Combo 2 da 300 kW nella postazione di destra. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-ewiva-high-power-cortemaggiore-pc-via-enrico-mattei-32-t28484.html
https://www.forumelettrico.it/forum/colonnine-ewiva-high-power-cortemaggiore-pc-via-enrico-mattei-32-t28484.html Comment by ForumElettrico.it 11/12/2022 11:09:35
Other Charging Locations
There are 9 matching results
Be Charge Eni
1
5
Public
Operational
Level 3: High (Over 40kW)
Type 2 (Socket Only)
Besenzone Sant'Omobono | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Free To X AdS Arda Est
3
11
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free To X AdS Arda Ovest
2
10
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Besenzone
1
Private - Restricted Access
Operational
Castello di San Pietro
1
3
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Saliceto Via del Ponte | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fontana Fredda 11 Settembre | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cadeo Palasport | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-10-07
Uploaded by ForumElettrico.it on 2022-11-12
Uploaded by ForumElettrico.it on 2022-11-12
Uploaded by ForumElettrico.it on 2022-11-12
Uploaded by ForumElettrico.it on 2022-11-12
Uploaded by ForumElettrico.it on 2022-11-12
Uploaded by ForumElettrico.it on 2022-11-12