GardaUno Lonato Familacharging location
http://www.gardauno.it/modulo-richiesta-mobility-card/
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
GardaUno http://www.gardauno.it/la-mappa-dei-punti-di-ricarica/ 800-133 966
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 4 out of 5 [ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-garda-uno-7-4-kw-la-rocca-lonato-bs-via-cesare-battisti-2-t3783.html Comment by ForumElettrico.it 10/06/2018 12:51:13
Rating: 5 out of 5 [ General Comment ]https://www.forumelettrico.it/forum/colonnina-garda-uno-7-4-kw-la-rocca-lonato-bs-via-cesare-battisti-2-t3783.html
Comment by ForumElettrico.it 10/06/2018 12:20:28
Other Charging Locations
There are 9 matching results
Ristorante Pizzeria Silvano - evway
2
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Vip'S Motel
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
McDonald's Desenzano del Garda | EnelX Fast
2
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Eni
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Desenzano Motori Srl | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
IPlanet AdS Monte Alto Est
2
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
IPlanet ads IP Monte Alto Nord
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ELECTRIEASE ADS Montealto Ovest
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
CC Lonato del Garda Via Mantova | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2018-10-06
Uploaded by ForumElettrico.it on 2018-10-06
Uploaded by ForumElettrico.it on 2018-10-06
Uploaded by ForumElettrico.it on 2018-10-06
Uploaded by aldodal on 2017-01-15