Bologna Andrea Costa | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Di fronte al parcheggio Antistadio e in pochi minuti a piedi troviamo diversi bar, ristoranti ed esercizi commerciali di ogni tipo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-20-kw-stadio-dall-ara-di-bologna-bo-via-andrea-costa-194-barca-t23367.html
https://www.forumelettrico.it/forum/colonnina-enel-x-20-kw-stadio-dall-ara-di-bologna-bo-via-andrea-costa-194-barca-t23367.html Comment by ForumElettrico.it 02/12/2022 10:57:57
Other Charging Locations
There are 9 matching results
Eneldrive Stadio Renato Dall'Ara
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Irma Bandiera | HERA
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Nettuno tennis club
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cimitero Monumentale di Bologna | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Calda
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via XXI aprile 1945
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Be Charge
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BOLOGNA Cimabue | ENELX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Pasubio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-02-12
Uploaded by ForumElettrico.it on 2022-02-12
Uploaded by ForumElettrico.it on 2022-02-12
Uploaded by ForumElettrico.it on 2022-02-12
Uploaded by ForumElettrico.it on 2022-02-12