Enel X Way Conad Massa Finalesecharging location
Lun-Sab 08:00-19:30
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]E' situata dentro al parcheggio del Conad e soggetta agli orari dello stesso, ovvero dal lunedì al sabato dalle ore 8 alle 19:30. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-way-22-kw-conad-finale-emilia-mo-via-monte-bianco-16-a-massa-finalese-t32865.html
https://www.forumelettrico.it/forum/colonnina-enel-x-way-22-kw-conad-finale-emilia-mo-via-monte-bianco-16-a-massa-finalese-t32865.html Comment by ForumElettrico.it 08/04/2023 08:54:53
Other Charging Locations
There are 9 matching results
Be Charge Municipio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Piva
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Piscina
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Scortichino Passardi | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Palazzetto dello sport di Mirandola MO
1
4
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repower Palestra Spazio Fitness
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Mirandola Maestri del Lavoro
1
4
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Evway Mirandola
1
4
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Ospedale
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-08-04
Uploaded by ForumElettrico.it on 2023-08-04
Uploaded by ForumElettrico.it on 2023-08-04
Uploaded by ForumElettrico.it on 2023-08-04
Uploaded by ForumElettrico.it on 2023-08-04