Duferco Ospedalecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Duferco Energie https://mobility.dufercoenergia.com/ +39 345 7051126
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]2 colonnine 2x22 kW nel parcheggio vicino alla farmacia comunale attigua all'ospedale. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-duferco-ospedale-di-mirandola-mo-2x22-kw-2x22kw-in-costruzione-t10646.html
https://www.forumelettrico.it/forum/colonnina-duferco-ospedale-di-mirandola-mo-2x22-kw-2x22kw-in-costruzione-t10646.html Comment by ForumElettrico.it 06/13/2023 10:50:36
Other Charging Locations
There are 9 matching results
Evway Mirandola
1
4
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Palazzetto dello sport di Mirandola MO
1
4
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Mirandola Maestri del Lavoro
1
4
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repower Palestra Spazio Fitness
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A MD
4
9
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ALDI Mirandola
1
4
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Edison Distributore Keropetrol
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Hotel La Cantina
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Sinergas Impianti Municipio
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-06-13
Uploaded by ForumElettrico.it on 2023-06-13
Uploaded by ForumElettrico.it on 2023-06-13
Uploaded by ForumElettrico.it on 2023-06-13
Uploaded by ForumElettrico.it on 2023-06-13