Repower Palestra Spazio Fitnesscharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Repower (Italy) https://www.repower.com/it/la-mobilita-elettrica/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]È situata davanti all'ingresso della palestra Spazio Fitness ed a 3 minuti a piedi troviamo un comodo bar. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-repower-22-kw-palestra-spazio-fitness-mirandola-mo-via-maestri-del-lavoro-4-t39792.html
https://www.forumelettrico.it/forum/colonnina-repower-22-kw-palestra-spazio-fitness-mirandola-mo-via-maestri-del-lavoro-4-t39792.html Comment by ForumElettrico.it 11/06/2024 11:31:41
Other Charging Locations
There are 9 matching results
Be Charge Mirandola Maestri del Lavoro
1
4
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Palazzetto dello sport di Mirandola MO
1
4
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A MD
4
9
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ALDI Mirandola
1
4
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Ospedale
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Evway Mirandola
1
4
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Edison Distributore Keropetrol
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Sinergas Impianti Municipio
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Hotel La Cantina
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-11-06
Uploaded by ForumElettrico.it on 2024-11-06
Uploaded by ForumElettrico.it on 2024-11-06
Uploaded by ForumElettrico.it on 2024-11-06
Uploaded by ForumElettrico.it on 2024-11-06