To edit, add comments or upload photos: Sign In
evway Comune di Pieve di Coriano charging location
Nearest Address:
Via Gorgadelli, 7
Pieve di Coriano
MN
46020
Italy
+39 02 92852220
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Public - Membership Required
Usage Cost:
free
Operational Status:
Operational
Latitude:
45.0333123017001
Longitude:
11.1062376226562
OCM Ref: OCM-84097
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-119498
22 kW
AC (Three-Phase)
400 V
32 A
Add your own comment/check-in for this location:
Sign InRating: 5 out of 5 [ General Comment , Charged Successfully ]http://www.forumelettrico.it/forum/colonnina-in-via-gorgadelli-7-pieve-di-coriano-mn-t862.html
http://www.forumelettrico.it/forum/colonnina-in-via-gorgadelli-7-pieve-di-coriano-mn-t862.html Comment by ForumElettrico.it 03/11/2017 12:56:39
Other Charging Locations
There are 9 matching results
Be Charge Revere
1
5
1.51 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Revere
3
8
1.94 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Villa Poma
1
5
2.42 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Piazza Arvati
1
4
2.51 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
6
2.93 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BeCharge Campo sportivo Schivenoglia
1
5
3.21 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune Di Poggio Rusco
3
5
4.03 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune di Magnacavallo
4.15 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune di San Giovanni del Dosso
3
7
4.85 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2017-03-11
Uploaded by ForumElettrico.it on 2017-03-11
Uploaded by ForumElettrico.it on 2017-03-11