evway Piazza Arvaticharging location
Colonnina posta all'interno della ZTL, per accedere è necessario un pass rilasciato dal comune
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 5 out of 5 [ General Comment , Charged Successfully ]Tutto ok! http://www.forumelettrico.it/forum/colonnina-in-via-arvati-villa-poma-mn-t842.html
Comment by ForumElettrico.it 03/03/2017 18:55:12
Other Charging Locations
There are 9 matching results
Be Charge Villa Poma
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune Di Poggio Rusco
3
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Campo sportivo Schivenoglia
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune di Pieve di Coriano
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune di San Giovanni del Dosso
3
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnerMia Campo Sportivo Comunale
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
evway Comune di Magnacavallo
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Revere
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Campo Sportivo San Giacomo | BeCharge
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2017-03-03
Uploaded by ForumElettrico.it on 2017-03-03
Uploaded by ForumElettrico.it on 2017-03-03
Uploaded by ForumElettrico.it on 2017-03-03