Be Charge Opificio Golinellicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]A 5 minuti a piedi si può arrivare all'Esselunga che è dotato di bar interno. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post176977.html#p176977
https://www.forumelettrico.it/forum/post176977.html#p176977 Comment by ForumElettrico.it 02/11/2021 16:50:26
[ General Comment , Equipment & Location Confirmed Correct ]Nel quartiere Reno-Borgo Panigale e non lontane dall'Ospedale Maggiore. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnine-be-charge-fast-opificio-golinelli-bologna-bo-via-paolo-nanni-costa-14-t14126.html
https://www.forumelettrico.it/forum/colonnine-be-charge-fast-opificio-golinelli-bologna-bo-via-paolo-nanni-costa-14-t14126.html Comment by ForumElettrico.it 11/23/2020 08:11:23
Other Charging Locations
There are 9 matching results
Bologna Ospedale Maggiore | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BOLOGNA Baracca BECHARGE
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BOLOGNA Cimabue | ENELX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge MAST
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cimitero Monumentale di Bologna | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge ALDI
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Pasubio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-02-11
Uploaded by ForumElettrico.it on 2021-02-11
Uploaded by ForumElettrico.it on 2021-02-11
Uploaded by ForumElettrico.it on 2021-02-11
Uploaded by ForumElettrico.it on 2020-11-23
Uploaded by ForumElettrico.it on 2020-11-23