Be Charge MASTcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Situata di fronte alla fondazione MAST, ma mancando ancora la segnaletica orizzontale è quasi sempre abusata. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-mast-bologna-bo-via-speranza-99-t25260.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-mast-bologna-bo-via-speranza-99-t25260.html Comment by ForumElettrico.it 05/21/2022 08:51:38
Other Charging Locations
There are 9 matching results
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Opificio Golinelli
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge ALDI
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Cimitero Monumentale di Bologna | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way McDonald's
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bologna Ospedale Maggiore | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Nettuno tennis club
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Casteldebole | EnelX
2
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-05-21
Uploaded by ForumElettrico.it on 2022-05-21
Uploaded by ForumElettrico.it on 2022-05-21
Uploaded by ForumElettrico.it on 2022-05-21
Uploaded by ForumElettrico.it on 2022-05-21