Be Charge Via Kennedycharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]È la colonnina più centrale di Castel Maggiore, che dista poco più di 200 metri in linea d'aria dal municipio. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-castel-maggiore-bo-via-fratelli-kennedy-15-t37319.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-castel-maggiore-bo-via-fratelli-kennedy-15-t37319.html Comment by ForumElettrico.it 05/11/2024 16:08:43
Other Charging Locations
There are 9 matching results
Campi Sportivi Castel Maggiore | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Castel Maggiore II Agosto 1980
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Piazza Amendola
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
McDonald's
1
1
Private - For Staff, Visitors or Customers
Not Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Eurospar Funo
2
Private - For Staff, Visitors or Customers
Operational
EnerCoop
1
Public - Membership Required
Operational
Be Charge Funo
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Funo
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Corticella
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-05-11
Uploaded by ForumElettrico.it on 2024-05-11
Uploaded by ForumElettrico.it on 2024-05-11
Uploaded by ForumElettrico.it on 2024-05-11
Uploaded by ForumElettrico.it on 2024-05-11