Piazza Amendolacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Di fronte al municipio troviamo farmacia, tabacchino, forno, pizzeria e bar con anche tavoli all'aperto. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-municipio-di-castel-maggiore-bo-via-pablo-neruda-2-a-t24594.html
https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-municipio-di-castel-maggiore-bo-via-pablo-neruda-2-a-t24594.html Comment by ForumElettrico.it 04/16/2022 16:17:32
Other Charging Locations
There are 9 matching results
BeCharge Castel Maggiore II Agosto 1980
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Via Kennedy
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Campi Sportivi Castel Maggiore | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eurospar Funo
2
Private - For Staff, Visitors or Customers
Operational
McDonald's
1
1
Private - For Staff, Visitors or Customers
Not Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Be Charge Funo
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnerCoop
1
Public - Membership Required
Operational
Enel X Funo
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Corticella
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-04-16
Uploaded by ForumElettrico.it on 2022-04-16
Uploaded by ForumElettrico.it on 2022-04-16
Uploaded by ForumElettrico.it on 2022-04-16
Uploaded by ForumElettrico.it on 2022-04-16