Be Charge Corticella charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Attenzione che al giovedì mattina si tiene il mercato del contadino, per cui la colonnina potrebbe non essere accessibile (da verificare). Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-bologna-bo-via-genuzio-bentini-40-corticella-t28005.html
https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-bologna-bo-via-genuzio-bentini-40-corticella-t28005.html Comment by ForumElettrico.it 10/22/2022 09:14:44
Other Charging Locations
There are 9 matching results
Be Charge Parco Alberto Sordi Cadriano
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Eni Corticella
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bologna Lipparini | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Parco dei Giardini
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eni
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Croce Coperta
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Bologna Corticella
3
5
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
EnerCoop
1
Public - Membership Required
Operational
McDonald's
1
1
Private - For Staff, Visitors or Customers
Not Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-10-22
Uploaded by ForumElettrico.it on 2022-10-22
Uploaded by ForumElettrico.it on 2022-10-22
Uploaded by ForumElettrico.it on 2022-10-22
Uploaded by ForumElettrico.it on 2022-10-22