Enel X Way AdS Tugo Ovestcharging location

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 2
Usage: Public
Operational Status: Operational
Latitude: 44.486582
Longitude: 9.939197
OCM Ref: OCM-174896
Network/Operator

Enel X https://eneldrive.enelx.com/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

CCS (Type 2)

Status Unknown
2 Present
OCM-CN-271013
65 kW DC

CHAdeMO

Status Unknown
1 Present
OCM-CN-536185
62 kW DC

Type 2 (Socket Only)

Status Unknown
1 Present
OCM-CN-536186
22 kW AC (Three-Phase)

Type 2 (Socket Only)

Status Unknown
1 Present
OCM-CN-536187
7 kW AC (Three-Phase)

Add your own comment/check-in for this location:

Sign In
[ General Comment , Charged Successfully ]

Nessun problema con card A2A sul connettore di destra. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post439709.html#p439709

https://www.forumelettrico.it/forum/post439709.html#p439709 Comment by ForumElettrico.it 04/29/2024 13:36:20
[ General Comment , Charged Successfully ]

Una fast DC da 65 kW con a fianco una wallbox da 7 kW, situata in un'area di servizio con potenza disponibile limitata a quanto pare. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-fast-ads-tugo-ovest-berceto-pr-a15-km-54-verso-la-spezia-t31566.html

https://www.forumelettrico.it/forum/colonnina-enel-x-fast-ads-tugo-ovest-berceto-pr-a15-km-54-verso-la-spezia-t31566.html Comment by ForumElettrico.it 04/02/2024 10:44:24
[ General Comment , Equipment & Location Confirmed Correct ]

Dotata fra l'altro di una presa 3A, l'ideale per una ricarica in autostrada :-). Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-scame-distributore-q8-autostrada-della-cisa-t7890.html

https://www.forumelettrico.it/forum/colonnina-scame-distributore-q8-autostrada-della-cisa-t7890.html Comment by ForumElettrico.it 04/18/2021 04:46:59

Other Charging Locations

There are 9 matching results

EnelX Berceto Piazza Bosco
1   2

Piazza Bosco
Berceto
PR
43042
Italy
View
2.91 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Piazza Bosco
1   4

Piazza Bosco
Berceto
PR
43042
Italy
View
2.91 Miles
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin

Plenitude Ghiare
1   5

Via Fondovalle 2
Berceto
PR
Italy
View
4.83 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Villaggio ecologico di Granara
1   4

Strada Branzone-Granara
Valmozzola
PR
43050
Italy
View
5.35 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)

Blitz Power AdS Montaio Ovest
3   9

Autostrada A15 della Cisa km 65,430
direzione La Spezia
Pontremoli
MS
54027
Italy
View
6.02 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Enel X Conad
1   5

Via Carlo Azeglio Ciampi 1
Borgo Val di Taro
PR
Italy
View
8.07 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

FERA Pontremoli
2   5

Via Bernardino Campi
Pontremoli
MS
54027
Italy
View
8.34 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Plenitude
1   5

Via Guglielmo Cacchioli 8
Borgo Val di Taro
PR
Italy
View
8.35 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Enel X Cassio
1   6

Strada Gigi Stok 2
Terenzo
PR
Italy
View
8.41 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In

Uploaded by ForumElettrico.it on 2024-04-29

Uploaded by ForumElettrico.it on 2024-04-29

Uploaded by ForumElettrico.it on 2024-04-02

Uploaded by ForumElettrico.it on 2024-04-02

Uploaded by ForumElettrico.it on 2024-04-02

Uploaded by ForumElettrico.it on 2024-04-02

Uploaded by ForumElettrico.it on 2024-04-02

Uploaded by ForumElettrico.it on 2021-04-18

Uploaded by ForumElettrico.it on 2021-04-18

Uploaded by ForumElettrico.it on 2021-04-18