Plenitude Ghiarecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Venendo da Parma, questa è l'ultima colonnina pubblica che si trova fino a Borgo Val di Taro e in pochi minuti a piedi troviamo un paio di bar e la stazione ferroviaria. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-plenitude-22-kw-berceto-pr-via-fondovalle-2-ghiare-t42673.html
https://www.forumelettrico.it/forum/colonnina-plenitude-22-kw-berceto-pr-via-fondovalle-2-ghiare-t42673.html Comment by ForumElettrico.it 06/22/2025 16:11:00
Other Charging Locations
There are 9 matching results
Villaggio ecologico di Granara
1
4
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Piazza Bosco
1
4
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
EnelX Berceto Piazza Bosco
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way AdS Tugo Ovest
3
10
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Cassio
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Conad
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plenitude
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Cimitero di Bardone
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Calestano
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-06-22
Uploaded by ForumElettrico.it on 2025-06-22
Uploaded by ForumElettrico.it on 2025-06-22
Uploaded by ForumElettrico.it on 2025-06-22
Uploaded by ForumElettrico.it on 2025-06-22