To edit, add comments or upload photos: Sign In
Piazza Boscocharging location
Nearest Address:
Piazza Bosco
Berceto
PR
43042
Italy
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
(Unknown)
Usage Cost:
Free
Operational Status:
Operational
Latitude:
44.510525
Longitude:
9.987866
OCM Ref: OCM-85594
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Unknown Usage Type
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CEE 3 Pin
Unknown
1 Present
OCM-CN-121698
3 kW
AC (Single-Phase)
240 V
16 A
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/prese-in-piazza-bosco-berceto-pr-t948.html Comment by ForumElettrico.it 04/09/2019 08:10:16
Other Charging Locations
There are 9 matching results
EnelX Berceto Piazza Bosco
1
2
0 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way AdS Tugo Ovest
3
10
2.91 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plenitude Ghiare
1
5
4.17 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Cassio
1
6
5.79 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Villaggio ecologico di Granara
1
4
5.87 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Blitz Power AdS Montaio Ovest
3
9
8.8 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Calestano
1
5
9.15 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Cimitero di Bardone
1
5
9.69 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Conad
1
5
10.55 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2019-04-09
Uploaded by ForumElettrico.it on 2019-04-09
Uploaded by ForumElettrico.it on 2019-04-09
Uploaded by ForumElettrico.it on 2019-04-09