Be Charge Hotel La Cantinacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Accanto abbiamo un hotel, un paio di ristoranti, un bar ed alcuni esercizi commerciali. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-hotel-la-cantina-medolla-mo-ss-12-185-t21704.html
https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-hotel-la-cantina-medolla-mo-ss-12-185-t21704.html Comment by ForumElettrico.it 11/22/2021 10:37:01
Other Charging Locations
There are 9 matching results
Be Charge Mobilandia
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Axpo - XService
2
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Edison Distributore Keropetrol
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Evway Mirandola
1
4
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Ospedale
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Palazzetto dello sport di Mirandola MO
1
4
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Powy Hotel Corte Vecchia
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Mirandola Maestri del Lavoro
1
4
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repower Palestra Spazio Fitness
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-05-30
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28