Enel X Way Eni Corticellacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema sulla CCS Combo 2 con app Wroom ed ho interrotto avvicinandomi all'auto e premendo il pulsante sulla presa auto. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post450745.html#p450745
https://www.forumelettrico.it/forum/post450745.html#p450745 Comment by ForumElettrico.it 07/07/2024 06:19:12
[ General Comment , Charged Successfully ]Lì intorno non c'è nulla, tranne il bar del benzinaio che però alla domenica è chiuso. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-fast-ads-eni-bologna-bo-via-william-shakespeare-19-corticella-t21832.html
https://www.forumelettrico.it/forum/colonnina-enel-x-fast-ads-eni-bologna-bo-via-william-shakespeare-19-corticella-t21832.html Comment by ForumElettrico.it 11/28/2021 17:29:20
Other Charging Locations
There are 9 matching results
Be Charge Corticella
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Parco Alberto Sordi Cadriano
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bologna Lipparini | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Parco dei Giardini
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Croce Coperta
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Bologna Corticella
3
5
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Be Charge Eni
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Zona Sportiva Arcoveggio | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnerCoop
1
Public - Membership Required
Operational
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-07-07
Uploaded by ForumElettrico.it on 2024-07-07
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28