Hera Parco dei Giardinicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
HeraRicarica Pubblica https://heracomm.gruppohera.it/casa/mobilita-sostenibile/ricarica-pubblica 800.087.591
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nei dintorni abbiamo bar, gelaterie, ristoranti ed esercizi commerciali di ogni tipo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-hera-21-kw-parco-dei-giardini-bologna-bo-via-dei-giardini-t26595.html
https://www.forumelettrico.it/forum/colonnina-hera-21-kw-parco-dei-giardini-bologna-bo-via-dei-giardini-t26595.html Comment by ForumElettrico.it 08/06/2022 15:37:28
Other Charging Locations
There are 9 matching results
Bologna Lipparini | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Croce Coperta
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Bologna Corticella
3
5
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Enel X Way Eni Corticella
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Parco Alberto Sordi Cadriano
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Corticella
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Eni
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Zona Sportiva Arcoveggio | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-08-06
Uploaded by ForumElettrico.it on 2022-08-06
Uploaded by ForumElettrico.it on 2022-08-06
Uploaded by ForumElettrico.it on 2022-08-06
Uploaded by ForumElettrico.it on 2022-08-06