Atlante Centro Civico di Montalecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Wroom https://wroom.org/ +39 035 36 92 145
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Situata nel parcheggio del Centro Civico di Montale, dove ha sede la biblioteca ma anche la polizia locale (utile casomai si trovasse un abusivo :D ). Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-atlante-22-kw-centro-civico-di-montale-castelnuovo-rangone-mo-via-zenzalose-38-t34657.html
https://www.forumelettrico.it/forum/colonnina-atlante-22-kw-centro-civico-di-montale-castelnuovo-rangone-mo-via-zenzalose-38-t34657.html Comment by ForumElettrico.it 11/18/2023 11:33:39
Other Charging Locations
There are 9 matching results
Hera Ecovillaggio Montale
3
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Atlante Ecovillaggio Montale
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Colombaro
2
8
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Atlante
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Sole
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Atlante Municipio
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Duferco Ospedale di Baggiovara
2
8
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Casinalbo
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BEST WESTERN PLUS Hotel Modena Resort
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-11-18
Uploaded by ForumElettrico.it on 2023-11-18
Uploaded by ForumElettrico.it on 2023-11-18
Uploaded by ForumElettrico.it on 2023-11-18
Uploaded by ForumElettrico.it on 2023-11-18