Atlante Ecovillaggio Montalecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Atlante https://atlante.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino a 56,9 kW ma i servizi di bar e ristorazione situati li accanto non sono però ancora operativi. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-atlante-fast-ecovillaggio-montale-castelnuovo-rangone-mo-via-beniamino-gigli-t36139.html
https://www.forumelettrico.it/forum/colonnina-atlante-fast-ecovillaggio-montale-castelnuovo-rangone-mo-via-beniamino-gigli-t36139.html Comment by ForumElettrico.it 06/06/2025 12:37:27
Other Charging Locations
There are 9 matching results
Hera Ecovillaggio Montale
3
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Atlante Centro Civico di Montale
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Colombaro
2
8
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Atlante
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Sole
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Atlante Municipio
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnerMia MD Ubersetto
1
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ubersetto Monte Ave Enel X | EnelX
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Casinalbo
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-06-06
Uploaded by ForumElettrico.it on 2025-06-06
Uploaded by ForumElettrico.it on 2025-06-06
Uploaded by ForumElettrico.it on 2025-06-06
Uploaded by ForumElettrico.it on 2025-06-06