A2A MDcharging location

Nearest Address:
Via Koki Fregni
Unione Comuni Modenesi Area Nord
MO
41037
Italy

053/520054
This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 9
Usage: Public
Operational Status: Temporarily Unavailable
Latitude: 44.894026
Longitude: 11.063364
OCM Ref: OCM-84718
Network/Operator

E-moving (Italy) http://www.e-moving.it/ 800035151

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

Type 2 (Socket Only)

Temporarily Unavailable
18 Present
OCM-CN-120345
22 kW AC (Three-Phase)

SCAME Type 3A (Low Power)

Status Unknown
18 Present
OCM-CN-453082
3 kW AC (Single-Phase)

Add your own comment/check-in for this location:

Sign In
[ General Comment , Charged Successfully ]

Nessun problema attivando con card A2A su una Tipo 2 ed ho interrotto avvicinandomi all'auto ed estraendo prima il cavo lato auto. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post384021.html#p384021

https://www.forumelettrico.it/forum/post384021.html#p384021 Comment by ForumElettrico.it 08/04/2023 15:05:15
[ General Comment , Charged Successfully ]

Il curioso caso delle 9 colonnine MD mai attivate per oltre 6 anni, ora sostituite con nuove A2A per un totale di ben 32 prese!. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/md-mirandola-ancora-non-attive-le-10-colonnine-t1208.html

https://www.forumelettrico.it/forum/md-mirandola-ancora-non-attive-le-10-colonnine-t1208.html Comment by ForumElettrico.it 05/30/2023 14:58:21
[ Important Notice (For Other Users) , Failed to Charge (Equipment Not Operational) ]

MDitalia e il comune di mirandola dicono che devono ancora terminare alcune pratiche.

Comment by pipog 05/01/2018 17:49:55
[ General Comment , Failed to Charge (Equipment Not Operational) ]

http://www.forumelettrico.it/forum/md-mirandola-ancora-non-attive-le-10-colonnine-t1208.html Comment by ForumElettrico.it 11/01/2017 22:48:01

Other Charging Locations

There are 9 matching results

ALDI Mirandola
1   4

Via dell'Orto, 2
Mirandola
MO
41037
Italy
View
0.1 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Be Charge Mirandola Maestri del Lavoro
1   4

Via Maestri del Lavoro 4
Mirandola
MO
41037
Italy
View
0.71 Miles
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Repower Palestra Spazio Fitness
1   5

Via Maestri del Lavoro 4
Mirandola
MO
Italy
View
0.76 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Duferco Ospedale
1   5

Via Papa Giovanni XXIII
Mirandola
Modena
41037
Italy
View
0.87 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Palazzetto dello sport di Mirandola MO
1   4

Via Dorando Pietri 23
Mirandola
MO
41037
Italy
View
1.14 Miles
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Evway Mirandola
1   4

Via Firenze 29
Mirandola
MO
41037
Italy
View
1.18 Miles
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Edison Distributore Keropetrol
1   4

Variante di mirandola
Mirandola
MO
41037
Italy
View
2.24 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Sinergas Impianti Municipio
1   5

Via Antonio Gramsci 29
San Possidonio
MO
Italy
View
3.29 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Trattoria Pizzeria Piccolo Borgo
2   3

Via Borgo, 41
Concordia sulla Secchia
MO
41033
Italy
View
4.2 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In

Uploaded by ForumElettrico.it on 2023-05-30

Uploaded by ForumElettrico.it on 2023-05-30

Uploaded by ForumElettrico.it on 2023-05-30

Uploaded by ForumElettrico.it on 2023-05-30

Uploaded by ForumElettrico.it on 2023-05-30

Uploaded by ForumElettrico.it on 2017-11-01

Uploaded by ForumElettrico.it on 2017-11-01

Uploaded by ForumElettrico.it on 2017-11-01

Uploaded by ForumElettrico.it on 2017-11-01