A2A MDcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
E-moving (Italy) http://www.e-moving.it/ 800035151
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema attivando con card A2A su una Tipo 2 ed ho interrotto avvicinandomi all'auto ed estraendo prima il cavo lato auto. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post384021.html#p384021
https://www.forumelettrico.it/forum/post384021.html#p384021 Comment by ForumElettrico.it 08/04/2023 15:05:15
[ General Comment , Charged Successfully ]Il curioso caso delle 9 colonnine MD mai attivate per oltre 6 anni, ora sostituite con nuove A2A per un totale di ben 32 prese!. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/md-mirandola-ancora-non-attive-le-10-colonnine-t1208.html
https://www.forumelettrico.it/forum/md-mirandola-ancora-non-attive-le-10-colonnine-t1208.html Comment by ForumElettrico.it 05/30/2023 14:58:21
[ Important Notice (For Other Users) , Failed to Charge (Equipment Not Operational) ]MDitalia e il comune di mirandola dicono che devono ancora terminare alcune pratiche.
Comment by pipog 05/01/2018 17:49:55
[ General Comment , Failed to Charge (Equipment Not Operational) ] http://www.forumelettrico.it/forum/md-mirandola-ancora-non-attive-le-10-colonnine-t1208.html Comment by ForumElettrico.it 11/01/2017 22:48:01
Other Charging Locations
There are 9 matching results
ALDI Mirandola
1
4
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Mirandola Maestri del Lavoro
1
4
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repower Palestra Spazio Fitness
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Ospedale
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Palazzetto dello sport di Mirandola MO
1
4
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Evway Mirandola
1
4
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Edison Distributore Keropetrol
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Sinergas Impianti Municipio
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Trattoria Pizzeria Piccolo Borgo
2
3
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-05-30
Uploaded by ForumElettrico.it on 2023-05-30
Uploaded by ForumElettrico.it on 2023-05-30
Uploaded by ForumElettrico.it on 2023-05-30
Uploaded by ForumElettrico.it on 2023-05-30
Uploaded by ForumElettrico.it on 2017-11-01
Uploaded by ForumElettrico.it on 2017-11-01
Uploaded by ForumElettrico.it on 2017-11-01
Uploaded by ForumElettrico.it on 2017-11-01