Be Charge charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Tethered Connector)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Dall'altro lato dell'edificio troviamo un comodo bar, ma il centro storico dista comunque pochi minuti e piedi. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-be-charge-ultra-fast-ostiglia-mn-via-aia-madama-32-t36643.html
https://www.forumelettrico.it/forum/colonnine-be-charge-ultra-fast-ostiglia-mn-via-aia-madama-32-t36643.html Comment by ForumElettrico.it 03/24/2024 16:10:27
Other Charging Locations
There are 9 matching results
evway Revere
3
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Revere
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune di Pieve di Coriano
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Municipio Borgofranco sul Po
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune di Carbonara di Po
2
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune di Magnacavallo
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Villa Poma
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Piazza Arvati
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Sustinente
2
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-03-24
Uploaded by ForumElettrico.it on 2024-03-24
Uploaded by ForumElettrico.it on 2024-03-24
Uploaded by ForumElettrico.it on 2024-03-24
Uploaded by ForumElettrico.it on 2024-03-24
Uploaded by ForumElettrico.it on 2024-03-24