evway Reverecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Una presa da 7,4 kW situata nel parcheggio del municipio, protetta da un cassonetto su ruote :-) . Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post345080.html#p345080
https://www.forumelettrico.it/forum/post345080.html#p345080 Comment by ForumElettrico.it 11/05/2022 11:50:05
[ General Comment , Did Not Visit Location ] https://www.forumelettrico.it/forum/colonnina-evway-22kw-comune-revere-mn-via-dei-poeti-3-t2743.html Comment by ForumElettrico.it 05/06/2018 19:45:20
[ General Comment , Charged Successfully ]https://www.forumelettrico.it/forum/colonnina-evway-22kw-comune-revere-mn-via-dei-poeti-3-t2743.html
Comment by ForumElettrico.it 05/06/2018 19:21:41
Other Charging Locations
There are 9 matching results
Be Charge Revere
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
evway Comune di Pieve di Coriano
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Municipio Borgofranco sul Po
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Villa Poma
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Piazza Arvati
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune di Magnacavallo
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
evway Comune di Carbonara di Po
2
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Campo sportivo Schivenoglia
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-11-05
Uploaded by ForumElettrico.it on 2022-11-05
Uploaded by ForumElettrico.it on 2022-11-05
Uploaded by ForumElettrico.it on 2022-11-05
Uploaded by ForumElettrico.it on 2022-11-05
Uploaded by ForumElettrico.it on 2018-05-06
Uploaded by ForumElettrico.it on 2018-05-06
Uploaded by ForumElettrico.it on 2018-05-06